March 12th, 2010
Soil tests look good for potential site of wastewater spray field
ST. MATTHEWS – Progress is being made on securing a site for the spray field for the St. Matthews Wastewater Treatment Plant, the project engineer reported at February’s town council meeting.
Read more on The Times and Democrat
Tags: field, Field Soil, good, look, potential, Project Engineer, site, Soil, Soil Tests, spray, Spray Field, St Matthews, tests, Times And Democrat, wastewater, Wastewater Treatment Plant
Posted in pressure washer | No Comments »
March 12th, 2010
Tags: 1/4Inch, 10.5, 3/8Inch, 300Degree, 37302, 4060, Duty, Entry, Female, Gallons Per Minute, Heavy, Heavy Duty, inlet, Max 3, Max Temp, Oregon, Outlet, Pressure, pressure washer, Product Description, Psi Max, Rear, Rear Entry, Trigger, Washer
Posted in pressure washer | No Comments »